Ponytrail Dr & Rathburn Road E Sanitary Sewer and Watermain

As part of the Regional Municipality of Peel’s State of Good Repair Program, IBI was responsible for the design and construction of new watermains and sanitary sewer main in the City of Mississauga.


Client
Regional Municipality of Peel
Location
Mississauga, ON
82.4% Open Cut
17.3% Jack & Bore
2019 Completion

IBI Group completed the new sanitary sewer and local watermain along Ponytrail Drive and Rathburn Road in the City of Mississauga. This assignment was part of the Region’s State of Good Repair Program to improve the municipal infrastructure and mitigate basement flooding issues in the area.

Some project challenges included utilizing open cut and trenchless construction methods within narrow, congested residential streets, and the installation of a sewer microtunnel in close proximity to a large existing storm sewer.

As part of the design and construction, IBI Group’s scope of work included:

  • Topographical survey
  • Base-map preparation
  • Preliminary design
  • Detailed design
  • Tender document preparation
  • Contract administration and inspection
  • Hydrogeological report